
Dzelme
politicianMale0.0Global Dominance: 0.00%
Dzelme is a key figure involved in the 'Rail Baltica' project, a major infrastructure initiative aimed at connecting the Baltic states with European rail networks. Recently, he stated that the construction of the first phase of the project could face delays of 3 to 5 years due to necessary redesigns aimed at reducing costs and addressing technical issues.
Power0
Reach0
Collect
Not in the pool (under ¢1).
Recent news mentions
Dzelme has resigned from his position as the chairman of the board of the European railway line.
Eiropas dzelzceļa līniju valdes priekšsēdētājs Dzelme atkāpies no amata / DienaDiena·
Latvia· 2026-02-27
Dzelme mentioned that the construction of the first phase of Rail Baltica could be delayed by 3-5 years.
Rail Baltica pirmās kārtas būvniecība varētu kavēties par 3-5 gadiem / DienaDiena·
Latvia· 2026-01-28

