Lila Darlami

Lila Darlami

engineer Nepal

Lila Darlami is an engineer with the construction company Shakti Crystal JV Dolakha, which is responsible for the electrification project in the region. He has stated that delays in progress are due to the government's inability to supply necessary construction materials, although he refuted claims that the project is stalled.

Global Media Ratings
Dominance
0.00%
Persistence
0 wks
Reach
26,416
Power
31$
Sentiment
5.00
Countries Mentioned
Country Mentions Sentiment Dominance + Persistence x Population = Reach x GDP (millions) = Power
Nepal 1 5.00 0.09% +0% 29,136,808 26,416 $34,000 31$
Totals 1 29,136,808 26,416 $34,000 31$
Interactive World Map

Each country's color is based on "Mentions" from the table above.

Recent Mentions

Nepal Nepal: Lila Darlami, an engineer from the contractor company Shakti Crystal JV Dolakha, stated that the construction work has been halted due to a lack of materials from the government. 5

Kantipur: सल्यानमा पूर्ण विद्युतीकरणको योजना अलपत्र- अर्थ / वाणिज्य